Project-10
WASTE AND WATER DISTRIBUTION
RUSTAMYAH MILITARY ACADEMY, Baghdad
LAGUNA CONSTRUCTION COMPANY Inc.
The cost of the project was $1,900,000 for a period of 4 months.Our work included the entire leveling, trenching on site but also the full installation of the different pipes and linking them to the entire network (the site size is about 450 acres). The job was performed between May 15 and August 15, 2005.